Commercial & Residential PA Sealed Plans
Project Summary -- North Hopewell-Winterstown Volunteer Fire Company
UCC Plans for New Commercial Buildings,
Building Additions, and/or Building Alterations
Project Introduction -- The building owner's representative self-performed the "Planner" building design role for this project. All members of the Building Design Work Group are listed below in the Project Summary. Please directly contact any of the following people who were in charge of the Building Design Work Group if you have questions about any building design function for this project. Contact information for the people who were in charge of the Building Design Work Group is::
ETA Building Design Process
The ETA Building Design Process has six (6) sequential design phases and four (4) primary design roles (Planner, Designer, Engineer, & Detailer). The ETA Logo at the left depicts the four (4) primary design roles required to design a new building, building addition, or alteration of an existing building using the ETA Building Design Process.
A one (1) page overview of the ETA Building Design Process can be accessed from the "Home", "About Us", "Services", and "Projects" pages. The ETA Building Design Process overview specifies the deliverables for each design phase, shows the design role responsible for the deliverables, depicts the design role interactions, and graphically represents the involvement of each design role throughout the six sequential design phases.
Contact me, Jonathan A. Snyder, if you have any questions about the ETA, Inc. Building Design Process. My telephone number and E-mail link are provided at both the top and bottom of this "Project Summary" page.
Project Summary -- North Hopewell-Winterstown Volunteer Fire Company
UCC Plans for New Commercial Buildings,
Building Additions, and/or Building Alterations
Engine Garage Resurfaced Floors
North Hopewell-Winterstown Volunteer Fire Co.
Renovated Commercial Kitchen
Renovated Commercial Kitchen
Renovated Men's Toilet Room
Renovated Women's Toilet Room
Added Accessible Toilet Rooms
Renovated Coat Room & Toilet Room Hallway
Added Accessible Drinking Fountain
Project Summary
North Hopewell-Winterstown Volunteer Fire Company
Pennsylvania Uniform Construction Code Compliance:
= Plan Review: PA Department of Labor & Industry
= Inspection: PA Department of Labor & Industry
= BCO: Pennsylvania Department of Labor & Industry
Building Design Work Group:
Project Site Location: Winterstown Borough
Street Address: 12246 Winterstown Road
County: York
State: Pennsylvania
Construction Cost: $430,000.00
Construction Type: II-B and V-B
Occupancy Classification: Group A-3 and Group S-2
Project Floor Area:10,923 Square Feet
ETA, Inc. Building Design Services Provided:
c Building Planning
c Building UCC Requirements
c Architectural Design & Drafting
c Building & Structural Engineering, Design, & Drafting
c Electrical Engineering, Design, & Drafting
c Mechanical Engineering, Design, & Drafting
c Plumbing Engineering, Design, & Drafting
c Alarm Design & Drafting
c Sprinkler Engineering, Design, & Drafting
ETA, Inc. Permit Services Provided:
c Building Permit: Full service provided.
c Driveway Permit: No change in site access.
c Storm Water Permit: Owner self-performed.
c Zoning Permit: Owner self-performed.
ETA, Inc. Land Development Services Provided:
c Site Plan: Full service provided.
c Site Access: No change or update required.
c Potable Water: No change or update required.
c Sanitary Sewage: No change or update required.
c Storm Water: Owner self-performed.
General Contractor: Luzier Contracting Co.
c Cabinet Contractor: Luzier Contracting Co.
c Electrical Contractor: Engles & Fahs
c Excavator: Glenn's Excavating
c Finish Carpenter: Luzier Contracting Co.
c Flat Work Contractor: Luzier Contracting Co.
c Flooring Contractor: Criterion Flooring Systems, LLC
c Framing Contractor: Luzier Contracting Co.
c Foundation Contractor: Luzier Contracting Co.
c Insulation Contractor: John H. Myers & Sons, Inc.
c Landscaping Contractor: Luzier Contracting Co.
c Masonry Contractor: Bruce Blouse
c Mechanical Contractor: Hopewell Heating & Air
c Millwork Contractor: Luzier Contracting Co.
c Painting Contractor: Bill Blymire
c Paving Contractor: B.C. Taylor
c Plumbing Contractor: Hopewell Heating & Air
c Fire Alarm Contractor: Advantage Security
c Roofing Contractor: Luzier Contracting Co.
c Siding Contractor: Luzier Contracting Co.
c Sprinkler Contractor: N/A
c Wallboard Contractor: Luzier Contracting Co.
Primary Scope of Work:
= Building Addition for Kitchen Pantry & Storage
= Kitchen Renovation
= Assembly Hall Renovation
= Toilet Room Renovation
= Accessible Toilet Rooms Added
= Fire Alarm System Update
= Composite Floor Finish
= Grade Stabilization -- Retaining Wall
= On-Site Driveways & Parking Lot